Langley Infrastructure Project (L.I.P.)

Bond Information
Click here to view the 2019 Bond Fact Sheet
2019 Water Management System Improvement Bond Frequently Asked Question

PHASE I - Site Investigation Feasibility Analysis
DCG Proposal for Civil Engineering Services

PHASE I REPORTS
09/15/2020 Langley Utility Improvements - Feasibility BOD Draft
09/01/2020 Base Mapping

09/01/2020 Langley Utility Improvements - Feasibility BOD Draft
07/02/2020 Draft - Critical Area Report
06/29/2020 Langley Utility Improvement Arborist Report Update
06/29/2020 Palmer Geo - Langley CIP REV1 Final Geo Report
06/12/2020 Caldera Archaeology Technical Report

PHASE 2 - Design Development and Construction Documents

DCG Proposal-Phase 2A-Civil Engineering Services

PHASE 2A REPORTS
2020-03-08_LIP-30% submittal (88Mb)
2021-03-12_ LIP Root Investigation-Pothole Report

LANGLEY INFRASTRUCTURE PROJECT (LIP) UPDATES
04-06-2021 LIP Project Update Phase 2A
03-03-2021 LIP Project Update Phase 2A
12-31-2020 LIP Project Update Phase 2A

10-07-2020 LIP Project Update
09-04-2020 LIP Project Update
08-26-2020 Basis Design Status
07/02/2020 LIP Project Update
06/01/2020 Preliminary Draft

04/27/2020 Field Work Continues
04/13/2020 Geotechnical Team
03/24/2020 Field Work Begins

Preliminary Information:
Utility Failure Map
2019 Capital Improvement Projects
Langley Infrastructure Committee Report  (with Presentation Correction)